

LV2c Conceptual Design
LV2c Conceptual Design (Updated 8/19/06)
Project: We're currently designing the LV2c airframe after our August 2005 successful-but-fatal launch.
Meetings: The airframe team meets on a roughly bi-weekly basis. See the 'Airframe' section on the PSAS schedule page for upcoming meetings.
Airframe Team Mailing list: We have a mailing list for active PSAS airframe team members.
PSAS Airframe Team: AirframeTeamRoster
Airframe Project Information
- AirframeWorkProgress
- LV2c Aluminum Module Design
- LV2c Nosecone Design
- LV2c Parachute Recovery Design
- LV2 Line Cutters
- LV2 Airframe Jigs
- LV2 Aeroshell Construction
- LV2 Launch Lugs
- LV2c Motor Casing
- LV2 Fin Attachment Clamps
- Igniters for the LV2c recovery system
- LV2 Airframe Archive
Airframe Team Information
The old LV2 page is here.
Airframe Team Meeting Notes
Also see: UpcomingAirframeAgenda
To add a new entry, please use the date of the entry (YYYY-MM-DD) and then add a [[!meta title="YYY-MM-DD - Title here!"]] line to give it a title. Don't forget to also tag it with [[!tag airframe]] so it shows up in this list!
2008-08-13 - Switched launch dates, airframe update, and avionics update.
2008-08-06 - Nosecone built! With Pics!
2008-07-23 - New avionics folks, nosecone mold finished, OSCON
2008-07-16 - PLUG meeting talk, Airframe planning meeting, and spin table handoff
2007-08-08 - General meeting; ikiwiki demo session
2007-04-01 - Dan prototypes the new recovery system, again.
2007-02-04 - Test of the Nose Separation Ring System (SRS)